GRAIN ELEVATOR DEMOLITION
Ruby, NE
Ruby, NE
PROJECT DETAILS:
CL Construction completed the demolition and site reclamation of a 1920s-era grain elevator facility in Ruby, Nebraska for Farmers Cooperative. The project included the removal of the headhouse structure, fertilizer building, truck pit, scale, overhead loadout bins, conveyors, pads, and footings. Using a 65-foot Kobelco high reach excavator, crews safely dismantled the aging structures, recycled concrete and metal materials whenever possible, and hauled remaining debris off-site. Following demolition activities, excavated areas were backfilled and compacted to restore the site for future use.
PROJECT FEATURES:
• Demolition Completion: August 2026
• Farmers Cooperative - Ruby, Nebraska
• 1920s Grain Elevator
• 65' High Reach Excavator
• Full Facility Demolition
• Concrete & Metal Recycling
• Site Backfill & Restoration